Commissioning Panel
Run the commissioning workflow step by step. Mark tasks, review details, and prepare the handover package.

Overall progress
0 / 19 Completed
Checkmarks are stored on this device (localStorage).
Commissioning checklist
Pre-Checks
Documents, permits, and readiness before entering the site.
Verify the document pack
Latest P&ID, layout, schematics, equipment datasheets, and revision list.
Safety permits and risk list
Site permits, LOTO, risk assessment, and emergency plans signed off.
Calibrated tools check
Torque wrench, pressure gauge, multimeter, and test gear calibration dates.
Critical consumables
Gaskets, hoses, fittings, and essential spares available.
Mechanical Assembly Checks
Torque logs, markings, alignment, and mechanical verification.
Complete torque logs
Record target torque, tool, and operator for critical joints.
Witness marking
Mark torqued joints with paint or witness marks for quick audits.
Alignment verification
Check couplings, bearing seats, and moving components for alignment.
Pneumatic / Hydraulic Checks
Leak tests, pressure hold, and cleanliness controls.
Leak test
Run low-pressure leak check and document any leak points.
Pressure hold
Monitor pressure drop over the specified hold time.
Filter and fluid cleanliness
Confirm filters and fluid cleanliness to spec before operation.
Electrical / Instrumentation
Sensors, wiring, and I/O validation.
Validate I/O points
PLC signals, sensor readings, and polarity checks.
Grounding and insulation
Grounding continuity, insulation test, and cable labeling.
Sensor calibration
Pressure, temperature, and flow sensor certificates verified.
Functional Tests
Cold/hot cycles and acceptance criteria.
Cold run
No-load run to check speed, vibration, and noise.
Hot cycle
Check thermal stability, expansion, and steady-state behavior.
Acceptance criteria
Verify performance, energy, and quality targets.
Handover Package
Logs, checklist, and close-out documentation.
Test and torque logs
Archive test reports and torque logs in the handover pack.
Checklist sign-off
Attach signed checklist and approvals.
Training and handover
Operator training, maintenance plan, and spares list.